PROJECT DESCRIPTION
  • Client: The English Tapware Company
  • Location: 424 Oxford Street, Paddington
  • Completion Date: 20/08/2024
  • Project Duration: 4 days

Tradies Combined completed full wall and ceiling reinstatement works to deliver a seamless, paint-ready interior aligned with the client’s specifications.

Our team framed open ceiling sections and installed 13mm plasterboard to close existing openings, cavities, and previous cutouts. All former light-fitting openings were professionally corrected, including rectifying substandard repairs left by another contractor.

Plasterboard joints were set using a two-coat base and topcoat system, with external angle beads fitted to all corners to ensure crisp, durable edges. Walls and ceilings were sanded smooth for a flawless finish.

The project was finalised with the installation of cladding boards as per the client’s drawings, resulting in a high-quality, fully prepared interior ready for painting and final fit-out.